Regenerative Land Unit
A single project context for people, land, ecological condition, settlement, technical systems, rules and long-term stewardship.
Permanent residents
5
1 household
Total land
6.2 ha
1 declared parcel
Overall readiness
62%
Current state
| Land responsibility | PASS |
| Ecological baseline | UNKNOWN / PARTIAL |
| Regeneration plan | DRAFT |
| Housing | PLACEHOLDER |
| Water | INCOMPLETE |
| Planning permission | REQUIRES_AUTHORITY_CHECK |
Next actions
Complete ecological baseline before interpreting regeneration performance.
Define water storage and demand assumptions before the proposal can be considered complete.
The platform does not determine planning permission. Authority review remains required.
Site & Parcels
The site is the spatial container for the RLU. Domain objects remain authoritative; the map is an interaction layer.
Site map
Conservation
1.0 ha
1.0 ha
Productive regeneration
2.8 ha
2.8 ha
Active regeneration
2.0 ha
2.0 ha
Settlement
0.4 ha
0.4 ha
Conservation
Productive regeneration
Active regeneration
Settlement
Parcel
Parcel ID
PARCEL-001
Area
62,000 m²
Source
Declared
Geometry
Not yet verified
Cadastre ref.
UNKNOWN
People & Land Responsibility
Human presence creates a land responsibility. The reference value is provided by the active RuleSet, not hard-coded by the application.
Residents
5
Reference
1.0 ha
per person · research parameter
Required land
5.0 ha
Land responsibility calculation
| Input | Value | Source | Status |
|---|---|---|---|
| Permanent residents | 5 | Project | DECLARED |
| Land reference / resident | 10,000 m² | RRLS-DEMO 0.1.0 | RESEARCH |
| Required land | 50,000 m² | Derived | DERIVED |
| Available land | 62,000 m² | Parcel | DECLARED |
| Result | Available land ≥ required land | PASS | |
Ecological Baseline
Baseline describes current reality. It is intentionally separate from the rules that later judge the proposal.
| Dimension | Current observation | Status | Evidence |
|---|---|---|---|
| Soil | Low organic cover in southern zone | DECLARED | 3 photos |
| Water / hydrology | Seasonal runoff; no retention model yet | PARTIAL | 1 field note |
| Vegetation | Mediterranean scrub + open degraded area | DECLARED | 5 photos |
| Biodiversity | Not assessed | UNKNOWN | — |
| Fire resilience | Not assessed | UNKNOWN | — |
Regeneration
Regeneration is modeled as a spatial and temporal trajectory. Reforestation is one pathway, not the definition of regeneration.
Land-use allocation
| Conservation | 1.0 ha |
| Active regeneration | 2.0 ha |
| Productive regeneration | 2.8 ha |
| Settlement & infrastructure | 0.4 ha |
Pathways
SYNTROPIC_AGROFORESTRY
SOIL_RESTORATION
WATER_LANDSCAPE
CONSERVATION
Trajectory
Baseline
Partial
Partial
Year 1
Soil cover + water works
Soil cover + water works
Year 3
Multi-layer structure
Multi-layer structure
Year 5
Lower external inputs
Lower external inputs
Year 10
Resilience target
Resilience target
Targets are intentions, not observations. They do not count as achieved ecological performance.
Settlement & Housing
RRL consumes building truth through a HousingSolutionSnapshot. It does not own provider-internal building models.
Housing solution
| Provider | Reference | Floor area | Footprint | Engineering |
|---|---|---|---|---|
| Biggest Mini Village | BMV-DEMO-CONFIG-001 | 96 m² | 96 m² | ENGINEERING_REQUIRED |
Roof area
112 m²
Catchment
108 m²
Demountability
Yes
DECLARED
Energy & Water
Technical systems are evaluated at RLU level because one site may contain multiple buildings and shared infrastructure.
Energy
Energy demand model UNKNOWN
Water
| Roof catchment | 108 m² | DERIVED |
| Rainfall dataset | Missing | UNKNOWN |
| Storage capacity | Missing | INCOMPLETE |
| Demand | Missing | INCOMPLETE |
Compliance & Proposal
Compliance is an explainable comparison between project state/evidence and an exact RuleSet version. It does not replace authority decisions.
| Rule / check | Result | Why |
|---|---|---|
| LAND-001 · Land responsibility | PASS | 6.2 ha available vs 5.0 ha required |
| REGEN-001 · Regeneration area | PASS | Demo allocation currently exceeds demo minimum |
| SETTLEMENT-001 · Settlement footprint | INCOMPLETE | Final settlement geometry not yet verified |
| WATER-001 · Water strategy | INCOMPLETE | Rainfall/storage/demand evidence missing |
| Planning permission | REQUIRES_AUTHORITY_CHECK | Outside software authority |
Proposal readiness
62%
Readiness is a workflow indicator, not a legal approval score.
Generate
A final proposal will be generated from a locked ProjectRevision + exact RuleSet + exact HousingSolutionSnapshot references.